A Lifecycle View - Total Cost of Ownership

Are your buildings costing more than they should over their lifespan? Take a different approach to designing and constructing new facilities.

Initial costs of Facilities represent only 15% of a building’s total cost, according to The National Research Council. Public sector or Corporate Facility Management organizations who ignore this fact when developing a building are wasting an opportunity to minimize the other 85% of their costs. While minimizing the initial capital cost of your building seems right, it’s costing you a lot more over the life of the building.The problem is visibility. The initial capital cost is the most visible part of the procurement and decision making process. The high cost of bad decisions is seen only after the building is occupied.

The procurement of corporate or public government buildings is unique. In essence, they are designed, built, occupied, operated and ultimately disposed of or completely renovated after a long life. Unlike a commercial property, which often includes a short-term financial view, this involves the full life cycle of a building. This means decisions made by Facility Managers and others related to the design and construction have long-term cost impacts to public sector organizations. The longer you own a building, the higher the impact of inefficient operating costs.

The problem is that there is no accountability for the impact of design and construction on the ongoing costs to operate the building, including energy, security, janitorial, landscaping, staffing and other costs. There are three real issues that create this extra cost:

  • Pressure during procurement phase to reduce initial capital cost.
  • Procurement methodologies reward low initial cost.
  • Effective mechanisms to reduce total cost exist but are not being used

Visibility into the total cost of ownership is one way to address the issue. Justification and decisions should be based on the total cost of ownership, not just initial costs.

Implement techniques that drive down the total cost of the building, not just the initial cost. Use effective financial analysis to illustrate the benefits and shift the behaviour of decision makers.

By estimating the total cost of operating over the life of the facility based on a more efficient design and the implementation of key techniques and by using this information as part of the budgeting and decision making process, you are more likely to arrive at a better decision – one that may include more up-front funding to design and build a more efficient building.

Reducing Total Costs through design and construction

The easiest way to reduce total costs is to build operating efficiency into the design and construction of the building using existing techniques, many of which are well developed but not always used.

The caveat is that these techniques may extend the total project time, will introduce increased consulting/professional fees up-front and may result in design changes that increase initial costs. Build these techniques into the initial schedule and budget and then use the results, along with the related financial analysis, to justify increased construction costs that reduce ongoing costs.

Multi-disciplinary approach to design

As mentioned, the design of the building has an impact on ongoing costs. There are many disciplines involved in the design, however they are usually led by architectural considerations first, followed by the design of systems by mechanical, structural and electrical engineers to name a few.

Involving and including the full range of disciplines at the commencement of the project and throughout the design using a team approach to design rather than an architect led approach enables better integration of the disciplines and ensures the best solutions drive the design rather than the design driving the solutions.

Green Initiatives

Green buildings are expected in the current economic and political climate, especially for corporate or public facilities. Using green standards and initiatives typically result in slightly higher initial cost but they result in lower ongoing energy costs. This is not only politically and socially correct, it contributes to a lower total cost of ownership.

The increased costs of a green building, especially when it is LEED certified, are usually easier to justify and get approval for. Some levels of government are already mandating or encouraging green buildings. Keep in mind that while formal standards and initiatives such as LEED carry the green label, other techniques should also be used to reduce costs. When justifying the increased cost, be sure to take the full benefits of energy reductions from all initiatives into account under the banner of green initiatives.

Facility operations input in design

It is rare that during the design phase of a new project, facility professionals are consulted to provide input on the design and provide guidance to minimize future operational costs.

Since the ongoing costs are up to 85% of the total costs of ownership, this is a significant oversight. If you have adequate internal operations resources with the time and experience necessary, this is a very low cost method. You may need to augment internal resources with external resources or consultants for certain areas. For instance, involving service providers for janitorial, grounds, maintenance, guard services and other services will provide invaluable guidance on design elements that can reduce operational costs.

Examples include designs that enable easy access for maintenance, surfaces with low maintenance and janitorial costs, physical design and technology that reduce the need for guards, adequate space that is efficiently located for maintenance and janitorial services to reduce labour needs and modern building automation that enables efficient ongoing management and maintenance of systems, including energy conservation.

Since operations and maintenance staff can be a significant operational cost, design and equipment selection that can reduce staff requirements should be included.

As always, the earlier decisions and initiatives are taken during the design phase, the easier they are to include in the final design. Include the facility operations input from the start.

Life cycle costing

The life cycle costing analysis takes four key cost components into account to determine the lowest total cost of design alternatives. It’s a well established economic analysis that takes a component by component approach to the initial cost, maintenance costs, energy costs and replacement or renewal costs of the equipment over the life of the building.

The analysis is rigorous, taking into account the time value of money and inflation to develop a net present value for the total cost of the components over their entire life cycle. This technique enables effective decisions related to design and equipment selection alternatives and options, ensuring the best choices for total cost of ownership, not just initial construction costs.

This technique provides the information and evidence you need to influence decision making if the final design exceeds budget but demonstrates the lowest total cost of ownership. This technique can be used for a design/build tender to achieve the lowest total cost rather than the lowest initial construction cost.

By requiring lifecycle costing analysis by a third party as part of each submission and using the results as a basis for final selection, rather than just the initial cost, you can make the best financial decision.

Value engineering

This tool is closely related to life cycle costing and they often work together. Unlike life cycle costing, value engineering goes beyond purely financial analysis and assesses the design, including materials, equipment and functional requirements.

The intent is to eliminate or modify elements of the design that are either not required to achieve the functional requirements or add unnecessary costs. This isn’t engineering in the same sense as mechanical, structural or electrical engineering for building systems. It is engineering in the broader sense, including not only quantifiable elements such as equipment and materials, but also non quantitative aspects such as productivity, aesthetics, occupant comfort, performance and functionality.

Generally, value engineering will drive design and equipment selection alternatives and life cycle costing will then analyze the total economic impact of those decisions.

Commissioning

Even if the design reflects the best value in initial cost and total cost of ownership, the actual implementation of the design during construction needs to be validated against the design specifications.

Studies indicate that the payback on commissioning costs for energy alone is 4.8 year by ensuring the systems actually operate as designed. While financial analysts may feel this payback is too long, they need to consider the cumulative benefits over the life of your facilities.

Commissioning is a quality assurance process that verifies that the systems installed during construction meet the original design criteria through testing and documentation. This process is conducted by third party commissioning consultants throughout the construction process.

Commissioning can be conducted on a system by system basis or a total building commissioning. The level of commissioning depends on the mandate given to the commissioning consulting and the costs you are willing to incur.

A total building approach includes a broader range of systems on an integrated basis, not on a system by system basis and is the preferred approach to ensure the lowest total cost of ownership. Commissioning should include functional performance testing as well as documentation of the design intent, operating parameters and sequences. This can also include developing system operations manuals to provide guidance on efficient operations for the facility staff.

The commissioning consultant should be involved in the design phase of the project so they are fully aware of the design intent and can develop their commissioning plan with full knowledge of the system design decisions. Commissioning should start as soon as possible during the construction phase.

To get the best value from the commissioning process, the facilities operations staff should be involved in the commissioning and receive training on the systems during the construction phase. Since the cost of operations are by far the largest part of the total cost of ownership, providing operational staff with the knowledge they need to operate the facility efficiently in accordance with the design intent is critical.

You can reduce the Total Cost of Ownership

Building new facilities presents a unique opportunity to focus on the total cost of ownership rather than simply the initial cost. The positive impact is both financial and environmental. The very long life and ownership of a typical corporate or public sector facility makes this stewardship even more important.

This article is © Copyright Michel Theriault. Please review our Permissions

You can also read our latest Facilities Management blogs at www.thebuiltenvironment.ca

image image image image image image image image image image image image image image image image image image
Benchmarking Even if you think you are doing everything right, how do you know unless you compare? No organization is the best at everything and the same is true for yours. So, if you aren’t benchmarking, you can’t possibly be doing everything you should be doing.
Service Contract Reviews A Service Contract Review by an independent third party can help you ensure that you are getting the services you expect, that your contract documentation, including procurement, pricing, measurement and management, are delivering the best value and even establish the best approach for a renewal or re-bid.
Personal Coaching Coaching is a standard business approach to help managers and leaders with their development and with specific elements of their job. A confidential third party who isn’t invested in the organization’s politics or imbedded culture guides you or your staff through ideas and options with an un-biased, broad based view that helps you look at things more objectively.
Training & Education Are you holding a quarterly or annual meeting with your global, regional or local Facilities team? Need something to pump up your staff, give them training on strategic, leadership or management approaches in FM or help them collectively deal with an issue?
FM Systems Implementation Implementing Property Management and Facilities systems including CAFM, CMMS, Work Order management and Help Desks can sometimes be the single most important thing you can do to improve service, reduce costs and preserve your assets, including reducing future costs.
Team & Meeting Facilitation Finding solutions,developing ideas, brainstorming or holding an annual staff session is easier with an external facilitator to draw out results and shephard discussion, giving your better value, less wasted time and full participation.
Business Cases Effective Business Cases that get the results you need are not easy. They take research, analysis and strategy, not to mention a well crafted and written document that gets the point across and influences your boss, board of directors, council, CFO and anyone else who has the ability to accept or reject your business case.
Satisfaction Surveys Satisfaction Surveys provide you with key information about your FM services to help you make decisions and improve services. Strategic Advisor develops and implements surveys for Facility and Property Managers. This includes Customer Satisfaction Surveys, Employee Satisfaction surveys, Tenant opinion surveys and more.
Asset Management Services Asset Management delivers results by integrating all aspects of managing properties It provides overall management of the facility maintenance, capital planning, repair and replacement strategies, energy cost reduction strategies and more. It helps you develop a strategy to manage your facilities and maintain asset value, minimize costs and ensure your facilities serve your core business effectively.
Writing & Presenting for FM Communicating clearly is important to get your ideas across, influence others, look professional and get better results. Yet most Facility Managers and Property Managers have never had formal training in this important area. Get better results by understanding how to create clear, compelling and influencial communications.


Transition & Change Transitioning can include internal organizational changes, implementation of systems, outsourcing, out-tasking or subcontracting initiatives.
Strategic Planning Strategic planning implies looking at the future, but most managers are so busy dealing with operational issues, personnel issues, customer service and the day-to-day facility requests and issues. If you want to improve or change your organization or your facilities and buildings, you need a solid strategic plan that maps the requirements, benefits, risks, issues and implementation plan so you can get approval and move forward.
RFQ / RFP Procurement Well structured Request For Proposals (RFP) get the best results for your contracting initiative. They are harder to develop than it seems, and often internal staff are too busy with other initiatives or are too close to the services to effectively develop the RFP's. You end up living with your service contracts for several years at a time, so you want things to go smoothly.
Customer Service Customer service is just as important in an internal service delivery model as it is with externally facing services. It's often even harder to achieve, however, and can have a significant impact on the customer satisfaction food chain, since what you deliver affects the productivity and success of those receiving your services.
FM Assessments Is your FM organization and systems giving you what you need? Are you up-to-date on the leading practices and what you could be doing differently? A review can help you fine-tune or completely revamp your organization and systems.
Policies & Procedures Consistent and effective results require well developed policies and procedures that not only meet the needs of the service, they are easy to understand and implement. The benefit of documenting them is to provide training material, consistency and an auditable process you can measure for performance.
Performance Management Managing performance is the most important thing you can do to improve your service and processes. If you don't measure results, you don't have solid management information that enables you to make decisions and improvements that lead to your success.

The problem is identifying the right measures that won't drive the wrong behaviours and then effectively reporting, analyzing and acting upon the results.
Outsourcing Decision Outsourcing can be a viable business model. Your organization may or may not benefit from outsourcing, however your success depends on effective analysis, decision-making and implementation. We help you assess the benefits and identify the costs and risks of this important decision. The exercise can also help you identify what you can do internally instead of outsourcing.

Free FM Resources

Get our free premium FM resources in a download link when you sign up to our list. Then you'll receive our newsletter and bulletins periodically.

E-mail Address:

First Name:

Latest FM Blogs

The FM Pie
Download Your Copy

Where is Michel Next?

  • 22 June 2012
    Seminar @ SIMA 22 June 2012 03:00 PM to 04:00 PM

    "Winning Enough Business? Write Better Proposals" This seminar is essential for suppliers in the FM industry.

  • 23 June 2012
    Seminar @ SIMA 23 June 2012 08:00 AM to 09:15 AM

    "Procuring Success" For either supplies or Facility Managers, this will introduce techniques to improve the results of procurement

  • 19 July 2012
    Seminar @ Total Facilities Live 19 July 2012 04:00 PM to 05:00 PM

    Strategic Facilities Management - Get Results This two-part seminar covers 4 key topics to success: communicating to Influence,